From: rdbgm@aol.com
Date: 11 Sep 2000
Time: 15:36:45
In a continous production run of product, I have determined to look at 1 pc per hour and make a decision (Pass/Fail). On this one sample taken from about 300-400 pcs over the last hour, I wantto know if I can reference a sound sampling plan that can help me be confident in the accept criteria. I want an AOQL of 0.01. Pls advise.