Delay between receipt and inspection

From: Warren
Date: 1/18/2006
Time: 9:48:11 AM

Comments

I am setting up a receiving/inspection system based on a tightened/normal/skip lot (ISO2859) process. My problem is that there is a signficant delay between when a lot is received (which is when the required inspection is assigned) and when it is actually inspected. So if I have 50 lots come in under normal inspect today and it takes a week for inspection to get to them, the next 10 lots may or may not get the proper inspection level. I realize that the 2859 process is more for an inspect-evaluate-inspect-evalute sequence. Questions: Can I adjust for this delay time? Or should I be using a different sampling plan?